Arcus archives
New Parramatta Bridge
Friday 14th April 2023

Excited to share this milestone update on the new Parramatta bridge📺
We’re working with world leader Teufelberger-Redaelli to deliver the Full Locked Coil (FLC) structural steel cables to support the suspended walkway from the bridges arch. We’re also delivering Flexi-Mesh stainless steel cable mesh and hamma stainless steel wire and fittings for the balustrading.
Click the link to watch the 9 News Story: https://lnkd.in/gZrHDH3y
To find out more reach out to our team Josh Sheedy, Shaun Salmon, Erin Hartley (Sheedy).
